Pump Installation Services

Professional Pump Installation Services | Precision Alignment | Colorado

Professional Pump Installation Services

Installed Right the First Time - Precision Alignment Guaranteed

Expert pump installation ensuring optimal performance, maximum efficiency, and extended equipment life. Code-compliant, precisely aligned to ±0.002", and backed by warranty.

Why Professional Installation Matters

⚠️ Installation Mistakes Cost Thousands Improper pump installation is the #1 cause of premature pump failure. Poor alignment alone reduces bearing life by 50% and can destroy a new pump within months. Don't risk it.

Studies consistently show that over 50% of pump failures are directly caused by improper installation. These aren't manufacturing defects - they're avoidable installation errors that cost thousands in repairs, lost production, and emergency service calls.

Common Installation Problems & Their Consequences:

  • Misalignment - Reduces bearing life by 50%+, causes vibration, premature seal failure. Most common installation error.
  • Soft Foot - Creates frame stress, bearing preload problems, and misalignment that changes under load.
  • Poor Piping Practices - Causes cavitation, air entrainment, suction problems, and efficiency losses of 10-30%.
  • Inadequate Foundation - Leads to vibration, misalignment, and structural failures. Concrete must be level within 0.002"/ft.
  • Incorrect Grouting - Results in soft foot development over time, corrosion, and loosening of mounting bolts.
  • Improper Electrical - Wrong voltage, phase rotation, or grounding can burn out motors or create safety hazards.
  • Skipped Commissioning - Pump runs but not optimally. Performance problems appear weeks later when harder to diagnose.
50%+ Pump Failures From Installation
10-30% Efficiency Loss From Poor Piping
±0.002" Our Alignment Tolerance
100% Code Compliant
✓ Professional Installation Benefits Proper installation delivers rated performance, maximum efficiency, extended equipment life (5-10 years typical), minimal maintenance, lower energy costs, and peace of mind with warranty protection.

Our 8-Step Installation Process

We follow a systematic, proven process that ensures every pump is installed correctly the first time. No shortcuts, no compromises.

  1. Pre-Installation Site Survey

    Before installation day, we visit your site to assess conditions, verify preparedness, and identify any potential issues. This prevents installation delays and ensures we bring the right equipment.

    • Foundation condition and levelness assessment
    • Piping layout verification and stress analysis
    • Electrical supply verification (voltage, phase, capacity)
    • Access routes and clearances for equipment
    • Special requirements identification (confined space, hot work permits, etc.)
    • Coordination with other trades (electricians, pipefitters)
  2. Foundation Preparation

    A solid, level foundation is critical for proper pump operation. We ensure your foundation meets or exceeds specifications.

    • Verify concrete strength (minimum 3,000 PSI for most applications)
    • Precision leveling - surface must be within 0.002" per foot
    • Anchor bolt verification (location, embedment depth, thread condition)
    • Grout pad preparation and surface cleaning
    • Install vibration isolation if specified (springs, pads, inertia bases)
    • Mark pump and motor centerlines on foundation
  3. Pump & Motor Mounting

    Precision mounting with proper shimming eliminates soft foot and provides stable base for alignment.

    • Place stainless steel shim packs under all mounting feet
    • Set pump and motor on foundation, hand-tighten bolts
    • Check level in multiple directions with precision level
    • Perform soft foot check (gap under any foot must be <0.002")
    • Adjust shims as needed to eliminate soft foot
    • Torque all mounting bolts to specification (typically 75-150 ft-lbs)
    • Re-check level and soft foot after torquing
  4. Piping Connection & Alignment

    Proper piping installation prevents suction problems, reduces stress on pump, and optimizes performance.

    • Install suction piping with eccentric reducer (flat side up to prevent air pockets)
    • Ensure straight run before pump inlet (5-10 pipe diameters minimum)
    • Install discharge piping with check valve and isolation valve
    • Support all piping independently - no weight or stress on pump
    • Use flexible connectors to isolate vibration
    • Install pressure gauges on suction and discharge
    • Verify no pipe strain when bolted up (can check with dial indicator)
  5. Precision Shaft Alignment

    This is the most critical step. We use laser alignment to achieve ±0.002" tolerance.

    • Mount laser alignment system on pump and motor shafts
    • Rotate shafts and record alignment measurements
    • Calculate required corrections (vertical and horizontal, both feet)
    • Adjust motor position with precision shims (add/remove as needed)
    • Move motor laterally by loosening bolts and using jacking screws
    • Re-measure alignment and repeat until within ±0.002" tolerance
    • Consider thermal growth (if pump handles hot fluids)
    • Final soft foot re-check after alignment complete
    • Torque all bolts to final specification and verify alignment holds
    • Document final alignment with measurement report
  6. Grouting

    Non-shrink epoxy grout provides permanent, solid mounting and corrosion protection.

    • Install forms around pump base (seal gaps to prevent grout leakage)
    • Clean and wet foundation surface (no puddles)
    • Mix non-shrink epoxy grout per manufacturer specifications
    • Pour grout from one side, allow to flow under pump base
    • Remove air pockets by poking with rod
    • Fill until grout appears on opposite side (1/8" to 1/4" thickness typical)
    • Smooth exposed grout edges
    • Allow to cure per manufacturer recommendation (typically 24-72 hours)
    • Re-check alignment after grout cures (curing can cause slight movement)
  7. Electrical Connections

    Performed by licensed electrician per NEC and local codes. We coordinate and verify.

    • Verify motor nameplate voltage matches supply
    • Install conduit and pull wires per NEC Article 430
    • Make terminal connections in motor junction box
    • Torque terminals to specification
    • Install and verify equipment grounding
    • Connect starter or VFD (if applicable)
    • Verify phase rotation with phase rotation meter
    • Megger test motor windings (insulation resistance check)
    • Test voltage under load before final startup
  8. System Commissioning & Startup

    Careful startup process ensures everything works correctly before we leave.

    • Flush piping system to remove construction debris
    • Fill system and prime pump (verify no air in pump casing)
    • Open discharge valve partially (never start pump deadheaded)
    • Perform bump test (momentary start to verify rotation direction)
    • Start pump and gradually open discharge valve
    • Monitor suction and discharge pressures
    • Measure motor current on all three phases
    • Check for leaks at all connections
    • Measure vibration and establish baseline
    • Measure bearing and motor temperatures (establish baselines)
    • Verify flow and pressure meet design specifications
    • Adjust as needed and re-test
    • Provide operating instructions to facility personnel
    • Complete commissioning documentation
📋 Documentation Package Included Every installation includes complete documentation: as-built drawings, laser alignment report with measurements, performance test data (pressures, flow, power), vibration and temperature baselines, photos of installation, maintenance schedule, and operator training checklist.

Installation Specifications & Standards

We adhere to industry-leading standards and manufacturer specifications on every installation.

Alignment Tolerances

Measurement Our Tolerance Industry Standard
Parallel Offset ±0.002" (0.05mm) ±0.005"
Angular Misalignment <0.3° <0.5°
Soft Foot <0.002" <0.005"
Foundation Level 0.002" per foot 0.005" per foot

Foundation Requirements

Concrete Specifications

  • Minimum Strength: 3,000 PSI
  • Thickness: 4" (small pumps), 6-8" (large)
  • Anchor Embedment: 10x bolt diameter
  • Cure Time: 28 days minimum

Mounting Hardware

  • Anchor Bolts: Grade 8 or better
  • Shims: Stainless steel (preferred)
  • Grout: Non-shrink epoxy type
  • Torque: Per manufacturer specs

Piping Best Practices

  • Suction Piping: One to two sizes larger than pump inlet to reduce friction losses and prevent cavitation
  • Eccentric Reducer: Flat side up on horizontal suction lines to prevent air pocket formation
  • Straight Run: Minimum 5-10 pipe diameters of straight pipe before pump inlet (no elbows right at pump)
  • Independent Support: All piping supported independently - no weight or stress on pump nozzles
  • Flexible Connectors: Rubber expansion joints to isolate pump vibration from piping system
  • Valving: Isolation valves on suction and discharge, check valve on discharge
  • Strainer: Suction strainer if handling fluids with particulates (with pressure drop consideration)
  • Gauges: Pressure gauges on suction and discharge for performance monitoring
⚠️ Common Piping Mistakes to Avoid Never install elbow directly at pump inlet (causes turbulence and uneven flow distribution). Never support piping weight on pump (causes stress and misalignment). Never use concentric reducers on horizontal suction (traps air). Never start pump with discharge valve closed (deadheading can damage pump immediately).

Pump Installation Applications

We install pumps for virtually any application. Here are our most common installations:

🏢

HVAC Systems

Chilled water, hot water, condenser water, boiler feed pumps. Proper installation prevents air problems, maintains system efficiency, and ensures proper flow balance.

🏭

Industrial Process

Transfer, circulation, metering, chemical feed pumps. Critical installations requiring precision alignment, proper seal systems, and material compatibility.

💧

Water/Wastewater

Raw water, high service, booster, lift station pumps. Installations meet EPA and local regulations with proper piping and electrical code compliance.

🌾

Agricultural

Irrigation, well, stock watering pumps. Reliable installations for critical growing seasons. We understand the importance of uptime during irrigation.

🔬

Chemical Processing

Corrosive, hazardous, high-purity fluids. Specialized installations with proper seal support systems, material selection, and containment.

Oil & Gas

Pipeline, injection, transfer pumps. High-pressure installations meeting API standards with redundancy and safety systems.

Installation Pricing & Timeline

We provide transparent pricing with detailed quotes before starting work. No surprises, no hidden fees.

Typical Installation Costs

Small Pumps

Up to 10 HP

$500 - $1,500
  • Single day installation
  • Basic alignment
  • Standard piping
  • Commissioning included

Medium Pumps

10-100 HP

$1,500 - $5,000
  • 1-2 day installation
  • Laser alignment
  • Complex piping
  • Full documentation

Large Pumps

Over 100 HP

$5,000 - $20,000+
  • 3-7 day installation
  • Precision alignment
  • Engineered systems
  • Extended warranty
📊 What's Included in Our Pricing Labor for all installation steps, laser alignment equipment and expertise, precision shims and mounting hardware, grouting materials, basic piping connections (flanges/unions), performance testing and commissioning, documentation package, 30-day follow-up inspection, and 1-year installation warranty.
Not Included (Quoted Separately) Foundation construction or major repairs, new piping fabrication and installation, electrical work (must be done by licensed electrician), controls and automation programming, building permits and inspections (we can coordinate), crane rental for very large pumps, and specialty tools for unusual applications.

Installation Timeline

Phase Small Pump Medium Pump Large Pump
Site Survey 2-4 hours 4-8 hours 1-2 days
Foundation Prep 0.5 day 1 day 1-3 days
Installation 1 day 1-2 days 3-5 days
Grout Cure 1-2 days 1-3 days 2-3 days
Commissioning 0.5 day 0.5-1 day 1-2 days
Total 3-5 days 5-10 days 10-20 days

Note: Timeline assumes foundation is ready, all materials are on-site, and no unexpected issues arise. Rush service available for additional fee.

What to Expect During Installation

Before Installation Day

  • We'll send site survey report outlining any preparatory work needed
  • Confirm installation date and estimated duration
  • Provide equipment list so you know what to expect on-site
  • Coordinate with your maintenance team, electricians, and other trades
  • Verify pump delivery timing (we can coordinate with supplier)
  • Obtain any required permits or hot work authorizations

During Installation

  • Our crew arrives with all necessary tools and equipment
  • Safety meeting and site walkthrough with your team
  • Work area secured with safety barriers and signage
  • Daily progress updates and any issue communication
  • Clean work area maintained throughout project
  • Flexible scheduling to work around your operations
  • After-hours or weekend work available if needed

Upon Completion

  • Complete documentation package delivered (alignment reports, test data, photos)
  • Training for your operators on proper startup and shutdown procedures
  • Review of maintenance requirements and schedules
  • 30-day follow-up inspection scheduled
  • 24/7 support number provided for any questions or concerns
  • Warranty documentation and terms explained

Installation Warranty

We stand behind our work with a comprehensive installation warranty.

1-Year Installation Warranty

Covers:

  • Installation workmanship
  • Alignment failures
  • Mounting hardware failures
  • Grout failures
  • Leaks from our connections

We will: Return to site, diagnose issue, make corrections at no charge for labor or materials related to installation.

Equipment Warranty

Pump & Motor:

  • Per manufacturer warranty
  • Typically 1-2 years
  • We coordinate claims
  • We perform warranty work

Note: Manufacturer warranty void if installation issues caused failure. Our professional installation protects your equipment warranty.

✓ Satisfaction Guaranteed If you're not satisfied with our installation quality, we'll make it right. Period. We've been in business over 50 years because we stand behind our work.

Frequently Asked Questions

Do you install pumps we purchased elsewhere?

Yes, absolutely. We install pumps from any supplier. We work with all major pump manufacturers and can install equipment you purchased directly, through a distributor, or online.

We do recommend consulting with us before purchasing to ensure you're getting the right pump for your application, but we're happy to install whatever you have.

How long does a typical installation take?

Most installations are completed in 1-7 days depending on pump size and complexity:

• Small pumps (<10 HP): 1-2 days
• Medium pumps (10-100 HP): 2-5 days
• Large pumps (>100 HP): 5-10 days

This includes foundation prep through commissioning. The main variable is grout cure time (1-3 days).

Do you handle the electrical work?

We coordinate with licensed electricians but do not perform the electrical work ourselves unless you prefer to use your own electrician.

Electrical work must be performed by licensed electricians per NEC and local codes. We can provide electrician recommendations or work with your preferred electrical contractor. We coordinate timing and verify electrical work is correct for pump operation.

What if our foundation isn't ready?

We can help with foundation preparation or recommend concrete contractors. Our pre-installation site survey identifies any foundation issues before installation day.

For new foundations, concrete must cure for 28 days minimum before pump installation. For existing foundations, we can repair minor issues or work with your team to prepare the surface.

Can you work after hours or weekends?

Yes, we offer flexible scheduling including evenings, weekends, and holidays to minimize disruption to your operations.

After-hours work is billed at 1.5x standard rate. Weekend and holiday work at 2x standard rate. Many customers find this worthwhile to avoid production downtime during business hours.

What happens if alignment changes after installation?

We provide 30-day follow-up inspection where we re-check alignment and make any necessary adjustments at no charge.

Alignment can shift slightly during grout cure or first few weeks of operation. This is normal and why we schedule follow-up. If significant alignment change occurs, we investigate root cause (foundation settling, piping stress, thermal growth) and correct it.

Do you offer installation training for our staff?

Yes, operator training is included with every installation. For maintenance staff, we offer more comprehensive training courses:

• Basic pump installation (2-day course): $1,500/person
• Laser alignment certification (1-day): $800/person
• Pump maintenance fundamentals (3-day): $2,200/person

Group rates available for multiple attendees.

What documentation do we receive?

Complete documentation package includes:

• As-built installation drawings
• Laser alignment report with actual measurements
• Performance test data (flow, pressure, power, efficiency)
• Vibration baseline measurements
• Temperature baseline data
• Installation photos
• Maintenance schedule and recommendations
• Warranty documentation
• Operator training checklist

All documentation provided in both paper and digital formats.

Ready to Schedule Professional Pump Installation?

Get it done right the first time. Contact us for detailed quote and installation timeline.

Free Site Survey | Transparent Pricing | 1-Year Warranty